深夜福利一区二区,女女同性女同一区二区三区九色 ,我与么公激情性完整视频在线观看,成在人线AV无码免费高潮水

Purchasing skills of drain pump

Date of issue:[2020-08-17]     Click through rate:    

The drainage pumps used in the building include submersible sewage pump, underwater drainage pump, vertical sewage pump and horizontal sewage pump. As the general site in the building is small and the displacement is not large, the submersible sewage pump and submerged drainage pump can be preferred for the drainage pump, among which the submerged sewage pump is generally used in important places; the vertical sewage pump and horizontal sewage pump are required to be equipped with isolation foundation, self irrigation water absorption, and occupy a certain space, so they are rarely used in buildings.

The flow rate of the drainage pump should be selected according to the design second flow rate of domestic drainage; when there is displacement adjustment, it can be selected according to the maximum hourly flow of domestic drainage. The flow rate of drainage pump in fire elevator sump shall not be less than 10L / s. After the head of the drainage pump is determined according to the lifting height and pipeline loss, a certain free head is added. The free head should be 0.02-0.03mpa. The velocity of suction pipe and outlet pipe of drainage pump should not be less than 0.7m/s and should not be greater than 2.0m/s. A standby pump should be set in each domestic drainage sump in public buildings, which should be operated interactively at ordinary times. If there are two or more drainage pumps for the basement, equipment room and garage, the pump can not be used. When the emergency drainage pipe cannot be set in the sump, the pump shall have uninterrupted power supply; when the drainage inlet pipe can be closed, the uninterrupted power supply can not be set, but alarm device shall be set.

When lifting the sewage and wastewater with large impurities, the outlet pipes of submersible sewage pumps in different catchments should not be discharged together; when lifting general wastewater, the outlet pipes of submersible sewage pumps in different catchments can be combined and discharged according to the actual situation. When two or more pumps share one outlet pipe, valves and check valves shall be installed on the outlet pipe of each pump. Check valve should be set when single pump drainage may cause backflow. It is not allowed to discharge the pressure drain and gravity drain pipe in the building. When the submersible sewage pump lifting contains large debris, the submersible sewage pump should be equipped with crushing device; when lifting sewage containing more fiber, large channel submersible sewage pump should be used.

When the motor power of submersible sewage pump is greater than or equal to 7.5kW or the outlet diameter is greater than or equal to DN 100, the fixed auto coupling device of the pump can be used; when the motor power of the submersible sewage pump is less than 7.5kW or the diameter of the outlet is less than DN 100, the mobile installation of the hose can be set. When the submersible sewage pump is used to drain the sewage sump, the pump fixed auto coupling device should be set to facilitate the maintenance of the pump. The drainage pump shall be able to start and stop automatically and manually on site. Multiple pumps can be operated alternately in parallel or in sections.

Technology Department


Address:576 Wuding Road, Jing'an District, Shanghai

E-mail:info@xinguangminggroup.com

97无码熟妇人妻| 操逼视频w .| 欧美一级家庭夫妻高潮视频| 高清无码操小烧逼| 美女逼大男人插进插出| 日本韩国国产黄色小视频网站| 免费打炮,三级片| 欧美亚洲日韩国产高清片| 96国产小视频| 亚洲sm一区二区三区AV| 男的操女的麻豆全视| 亚洲第一区第二区第三区免费观看| av仓库亚洲| 激情成人日韩欧美| 搞鸡巴AV| 女优字幕一区二区| 色色男女大鸡巴| 国外午夜| 机巴插逼入口| 色逼人妻骚| 嗯嗯啊啊啊啊啊嗯嗯嗯嗯嗯| 鸡巴对鸡巴免费视频| 91超碰免费观看| 马边| 91大神髙清无码| 少妇被粗大猛插进进出出 | 一区二区三区激情| 亚洲v∧w| 日本 a v有码| 国产精品在线观看国产主播| 嗯啊视频在线播放| 翘臀美女诱惑午夜福利院| 美女被插免费一区| 小穴流水网站| 大鸡巴日美女小穴元码片| 欧美吃鸡巴成人| 天堂Av啪啪| 五月成人婷婷网| 午夜视频啊啊啊啊啊啊| 国产欧美韩日在线| 少妇被大鸡巴艹高潮视频|